Get in touch

dylan@naviodata.io

Your PMS database,
built for you

Complete PMS databases for superyachts, built by a Chief Engineer who uses them. So you can focus on the vessel.

10+
Years at Sea
MCA Y1
Chief Engineer
80m+
Largest Vessel

You already know the problem.

Messy databases with equipment missing, intervals guessed, and spare parts that don't match what's onboard. The engineer who built it left two years ago, and nobody trusts the data anymore.

Or you're in the middle of a new build — commissioning systems, managing contractors, preparing for sea trials — and building out a PMS database is the last thing you have time for. But it needs to be ready for delivery.

We take that off your plate. A complete, professionally built database — structured properly from day one — so you can focus on what matters. Your crew stays in the loop at every milestone.

How It Works

1

Discovery

We discuss your vessel and requirements. Proposal with fixed pricing within 24 hours.

2

Documentation

You upload your technical documentation to a secure shared folder at your own pace.

3

Build

We build your database system by system from OEM documentation. Your crew reviews at three milestones.

4

QA

Full quality assurance — naming consistency, completeness, traceability, and duplicate checks.

5

Delivery

Your complete Excel workbook, database guide, and quantity templates. 30-day review period included.

What You Receive

A complete PMS database built from your technical documentation — delivered as a comprehensive Excel workbook that belongs to your vessel.

Equipment Hierarchy

Every system, every component — structured the way your vessel is actually built.

Maintenance Library

Complete manufacturer schedules with hours-based and calendar intervals. 'Whichever comes first' logic preserved.

Spare Parts Catalog

Full part numbers from OEM documentation, linked to the equipment that uses them.

Ready for Your PMS

Delivered as a comprehensive Excel workbook — your master reference file that belongs to the vessel, independent of any PMS platform.

Built to a Professional Standard

Every deliverable is engineered to the same standard you'd expect from a Chief Engineer building it in-house.

Consistent

Standardised naming conventions across all equipment, tasks, and spare parts.

Structured

Equipment hierarchy aligned to your vessel's actual build and shipyard documentation.

Traceable

Every entry sourced from and verifiable against OEM documentation.

Complete

Every system, every component, every manufacturer recommendation considered.

Crew-Reviewed

Your team reviews and confirms at each milestone, so the final product reflects how your vessel is actually run.

Quality-Checked

Verified against source documentation before delivery.

Built by Dylan Wentink

MCA Y1 Chief Engineer with over 10 years on motor and sailing yachts up to 80m+. I've worked on new builds, refits, and operational vessels — and built PMS databases on every one of them.

I've inherited bad databases. I know what works and what doesn't. NavioData exists to build databases properly — so the next engineer doesn't inherit the same problems I did.

Your Data, Your Choice

Your database is delivered in a standard Excel format that works with any PMS platform. Need it imported and configured? We can help with that too.

No software lock-in. No subscriptions. You own the database — no licensing fees, no restrictions. Just clean data that works.

Ready to discuss your vessel?

New build approaching delivery? Inherited a database that nobody trusts? Preparing for a refit? Tell us about your vessel and we'll have a proposal to you within 24 hours.

Get in Touch